Retail roofing / Cardiff city centre
RAAC roof replacement, phase 3
The third phase of St David's RAAC programme, extending the replacement deck and felt system across further blocks.
Phase 3 continued the removal and replacement of defective RAAC roof structures at St David's Shopping Centre, applying the methodology proven in the earlier phases to further areas of the centre. As before, the works were carried out above a fully operational retail environment with no interruption to trading.
The challenge
- Maintaining continuous trading for ground floor tenants
- Working within constrained service deck and access conditions
- Ensuring public safety at all times
- Coordinating tenants, centre management and specialist contractors
- Keeping fire and life safety systems fully operational throughout
Our approach
- Temporary roof structures maintaining full weather protection
- Safe isolation, removal and relocation of A/C condensers and AHUs
- Decanting and secure relocation of tenant stock off site
- Temporary compartmentalisation of fire safety systems
- Sequenced installation with clearly defined safe working zones
The solution
A new TATA RibDeck steel deck replaced the RAAC structure, finished with the same three-layer built-up felt system - Alumasc Derbigum Olivine cap sheet, high-performance bituminous layers and 210mm Rockwool insulation. Continuing the specification across phases gave the client a single, consistent roof covering with one guarantee position and a predictable maintenance regime.
Results
- Zero disruption to trading
- Consistent specification maintained across the wider asset
- Full fire and life safety compliance throughout
- Reliable installation within programme constraints